VisionLink ConnectPro Plan
Including all the features and benefits of the VisionLink Connect plan, VisionLink ConnectPro adds even more robust monitoring data for Cat® and other heavy equipment machine brands.
VisionLink ConnectPro Benefits
- INCLUDES ALL CONNECT PLAN BENEFITS
- PROACTIVELY MANAGE ASSET LOCATION with the use of geofencing and recording of asset entries and exits.
- INCREASED EFFICIENCY with expanded notifications.
- LOWER OPERATING COSTS with cost analysis and excessive idling reports.
- SITE SAFETY CONTROL with remote disable.
- INSTANT UPDATES with immediate access to requested asset hours and location data.
Call 866-292-7736 or contact a Warren CAT technology specialist online today to add or upgrade to VisionLink ConnectPro!
COMPARE ALL SUBSCRIPTION PLAN FEATURES
(Click/tap on a feature category below to compare plans.)
Data/Feature* |
Connect |
ConnectPro |
Performance |
PerformancePro |
Reporting Frequency
Reporting Frequency Default |
Daily |
Daily |
Cellular: 10 Minutes Cellular: 1 Hour Satellite: 4 Hours |
Cellular: 10 Minutes |
Immediate Fault Code Alerts |
Critical Level 3 |
Critical Level 3 |
All |
All |
Immediate Geo-Fence Entry/Exit |
— |
— |
✔ |
✔ |
Immediate Engine Start/Stop |
— |
— |
— |
— |
Monitoring
Hours & Location |
✔ |
✔ |
✔ |
✔ |
Odometer |
✔ |
✔ |
✔ |
✔ |
Place Asset in Groups |
✔ |
✔ |
✔ |
✔ |
Engine Start/Stop |
— |
✔ |
✔ |
✔ |
DEF Level |
— |
✔ |
✔ |
✔ |
Fuel Level |
— |
✔ |
✔ |
✔ |
Real Time Ping of Hours & Location |
— |
✔ |
✔ |
✔ |
Geo-Fences Entry/Exit |
— |
✔ |
✔ |
✔ |
Switch Inputs |
— |
— |
✔ |
✔ |
Operation
Asset Operation (Start/Stop) |
— |
✔ |
✔ |
✔ |
Asset Operation (Working vs. Idle) |
— |
— |
✔ |
✔ |
Utilization
Fuel Utilization (Working vs. Idle) |
✔ |
✔ |
✔ |
✔ |
Hour Utilization (Working vs. Idle) |
✔ |
✔ |
✔ |
✔ |
CO2 Calculations |
✔ |
✔ |
✔ |
✔ |
Distance Traveled |
✔ |
✔ |
✔ |
✔ |
Total Cost |
✔ |
✔ |
✔ |
✔ |
Excessive Idling |
— |
✔ |
✔ |
✔ |
Configure Custom Utilization Category |
— |
— |
✔ |
✔ |
Advanced Utilization (Integration Via Cat Productivity)
Total Payload & Cycle Count |
— |
— |
✔ |
✔ |
Payload per Cycle |
— |
— |
✔ |
✔ |
Utilization Breakdown (Long, Medium, Short) |
— |
— |
✔** |
✔** |
Utilization Map with Location Playback |
— |
— |
✔** |
✔** |
Cost Tracking (Site Level per Asset) |
— |
— |
✔** |
✔** |
Health & Maintenance
Event & Diagnostic Codes |
✔ |
✔ |
✔ |
✔ |
Links to Troubleshooting |
✔ |
✔ |
✔ |
✔ |
Integration with Cat Inspect, PCC & S·O·S℠ |
✔ |
✔ |
✔ |
✔ |
Create & Assign Tasks |
✔ |
✔ |
✔ |
✔ |
Request Service & Maintenance Planning |
✔ |
✔ |
✔ |
✔ |
View Safety Service Letter, Warranty, OMM |
✔ |
✔ |
✔ |
✔ |
Notifications & Reports (Examples)
Cost Analysis (Excessive Idle) Report |
— |
✔ |
✔ |
✔ |
Excessive Idle Notification |
— |
✔ |
✔ |
✔ |
Fuel Level Loss Notification |
— |
✔ |
✔ |
✔ |
Asset Movement Notification |
— |
— |
✔ |
✔ |
Operation Status Notification |
— |
— |
✔ |
✔ |
Job Site Runtime Report |
— |
✔ |
✔ |
✔ |
Administration
Asset Timeline Events |
✔ |
✔ |
✔ |
✔ |
Configure End-of-Day Report Time |
✔ |
✔ |
✔ |
✔ |
Remote Disable (Next Engine Start)*** |
— |
✔ |
✔ |
✔ |
Shared Assets to Other Accounts |
— |
✔ |
✔ |
✔ |
API
API Out |
— |
ISO 15143-3 & Next Gen |
ISO 15143-3 & Next Gen |
ISO 15143-3 & Next Gen |
*Actual Data and feature dependent on machine and telematics radio capabilities.
**A job site must be created.
***Additional hardware and/or software required.